Triple

T3622557
Position Surface form Disambiguated ID Type / Status
Subject Lawrence West station E76759 entity
Predicate isOnNetwork P33235 FINISHED
Object TTC subway E46847 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TTC subway | Statement: [Lawrence West station, isOnNetwork, TTC subway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TTC subway
Context triple: [Lawrence West station, isOnNetwork, TTC subway]
  • A. Scarborough Rapid Transit
    Scarborough Rapid Transit was a light metro line in Toronto, Canada, that served the Scarborough district as part of the Toronto Transit Commission’s rapid transit network.
  • B. Toronto Transit Commission
    The Toronto Transit Commission is the public agency that operates Toronto’s primary network of subways, buses, and streetcars.
  • C. Toronto subway chosen
    The Toronto subway is the primary rapid transit system in Toronto, Ontario, consisting of multiple underground and elevated lines that serve as the backbone of the city’s public transportation network.
  • D. TTC
    TTC is the station code for The Trafford Centre tram stop on Greater Manchester's Metrolink light rail network.
  • E. TTC
    TTC is an organizational partner of the 3rd Generation Partnership Project (3GPP), contributing to the development and standardization of mobile telecommunications technologies.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85dae2fc81908d1ceadbc6af0089 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc2bb12cc8190bd67597cf3b66a3a completed March 8, 2026, 6:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4882d20fc819082c0b640cddce269 completed March 13, 2026, 9:57 p.m.
Created at: March 8, 2026, 3:23 p.m.