Triple

T36219989
Position Surface form Disambiguated ID Type / Status
Subject N21 road E1047818 entity
Predicate hasBypassPlannedAt P118215 FINISHED
Object Adare NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Adare | Statement: [N21 road, hasBypassPlannedAt, Adare]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasBypassPlannedAt
Context triple: [N21 road, hasBypassPlannedAt, Adare]
  • A. hasBypass
    Indicates that one entity includes or is equipped with an alternative route or mechanism that circumvents or avoids another entity or process.
  • B. hasBypassProject chosen
    Indicates that an entity is associated with a project designed to bypass, circumvent, or provide an alternative route around something (such as a system, process, or constraint).
  • C. bypassedSince
    Indicates that one entity has been avoided, skipped, or circumvented by another entity starting from a specific point in time and continuing thereafter.
  • D. isPlannedAround
    Indicates that one entity is organized, scheduled, or structured with consideration of, or in alignment with, another entity as a central reference or constraint.
  • E. isPlannedThrough
    Indicates that something is intended to be achieved, organized, or carried out by means of a specified plan, method, or intermediary process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e42c878819095c8d19c0267fb87 completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69f7b58004f08190b47d3602e0aa50fb completed May 3, 2026, 8:52 p.m.
PD Predicate disambiguation batch_69f7b4c44390819084fb5558b354658f completed May 3, 2026, 8:49 p.m.
Created at: May 3, 2026, 4:09 p.m.