Triple

T3620416
Position Surface form Disambiguated ID Type / Status
Subject RATP standard metro signage E76710 entity
Predicate instanceOf P0 FINISHED
Object design standard C4263 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: design standard
Context triple: [RATP standard metro signage, instanceOf, design standard]
  • A. design practice
    Design practice is the systematic, iterative application of design methods, tools, and principles to solve problems, create meaningful experiences, and refine solutions in real-world contexts.
  • B. design bureau
    A design bureau is an organization or department that specializes in planning, developing, and refining product, graphic, or architectural designs, often providing creative and technical solutions for clients or internal projects.
  • C. engineering standard
    An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
  • D. standard chosen
    A standard is an established norm, rule, or benchmark used to measure, compare, or guide quality, performance, or behavior within a particular context.
  • E. software standard
    A software standard is an agreed-upon set of rules, formats, and practices that ensures compatibility, interoperability, and quality across different software systems and components.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85dae2fc81908d1ceadbc6af0089 completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:23 p.m.