Triple

T3615915
Position Surface form Disambiguated ID Type / Status
Subject Fermi Research Alliance, LLC E76599 entity
Predicate instanceOf P0 FINISHED
Object management and operating contractor C13492 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: management and operating contractor
Context triple: [Fermi Research Alliance, LLC, instanceOf, management and operating contractor]
  • A. infrastructure management company
    An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
  • B. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • C. transport infrastructure operator
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • D. mass transit operator
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • E. operational concept
    An operational concept is a high-level description of how a system, organization, or capability is intended to function in practice to achieve its objectives within a specific context.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85dae2fc81908d1ceadbc6af0089 completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:23 p.m.