Triple

T36093425
Position Surface form Disambiguated ID Type / Status
Subject Lion Yard, Cambridge E1043990 entity
Predicate instanceOf P0 FINISHED
Object pedestrian precinct C15040 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian precinct
Context triple: [Lion Yard, Cambridge, instanceOf, pedestrian precinct]
  • A. pedestrian-oriented commercial district chosen
    A pedestrian-oriented commercial district is a compact, walkable area where shops, services, and public spaces are clustered and designed primarily for people on foot rather than for automobile access.
  • B. pedestrian access point
    A pedestrian access point is a designated location where people on foot can enter, exit, or cross into a specific area, pathway, or transportation facility.
  • C. pedestrian village
    A pedestrian village is a compact, human-scaled settlement designed so that daily needs can be met on foot, with car access minimized or restricted to prioritize walkability, public spaces, and community interaction.
  • D. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • E. pedestrian network
    A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e32d60c8190ba781ffaaab4aa3d completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:08 p.m.