Triple

T3607420
Position Surface form Disambiguated ID Type / Status
Subject New Chitose Airport E76405 entity
Predicate railOperator P522 FINISHED
Object JR Hokkaido E270240 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: JR Hokkaido | Statement: [New Chitose Airport, railOperator, JR Hokkaido]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: JR Hokkaido
Context triple: [New Chitose Airport, railOperator, JR Hokkaido]
  • A. JR Hokkaido chosen
    JR Hokkaido is a regional railway company in Japan that operates passenger train services and related businesses across the island of Hokkaido.
  • B. Hokkaido Shinkansen
    Hokkaido Shinkansen is a high-speed railway line in Japan that connects the island of Hokkaido with the main Honshu island via the undersea Seikan Tunnel.
  • C. JR Tōkai
    JR Tōkai is a major Japanese railway company that operates the Tōkaidō Shinkansen high-speed rail line and other rail services in central Japan.
  • D. JR Yumesaki Line
    The JR Yumesaki Line is a railway line in Osaka, Japan, operated by JR West that connects central Osaka with the bay area, including major attractions such as Universal Studios Japan.
  • E. JR Saikyo Line
    The JR Saikyo Line is a major commuter rail line in the Tokyo metropolitan area operated by JR East, connecting central Tokyo with Saitama Prefecture and serving key hubs such as Shibuya and Shinjuku.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85da0ba481908b3b48c69efe2b98 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc228e24481909ae6a1e4ad796917 completed March 8, 2026, 6:38 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4330bc9f081909a5c1e6da885cfc5 completed March 13, 2026, 3:53 p.m.
Created at: March 8, 2026, 3:22 p.m.