Triple
T3605785
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Columbia River Treaty |
E76366
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydropower coordination treaty |
C8918
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydropower coordination treaty Context triple: [Columbia River Treaty, instanceOf, hydropower coordination treaty]
-
A.
water resources management agreement
chosen
A water resources management agreement is a formal arrangement between parties that defines rights, responsibilities, and coordinated actions for the sustainable allocation, use, protection, and monitoring of shared water resources.
-
B.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
C.
river basin organization
A river basin organization is an institutional body responsible for coordinating the management, development, and protection of water and related resources within a defined river basin across sectors and jurisdictions.
-
D.
multipurpose dam
A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
-
E.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85d93dcc819094fba90cf70f4996 |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:22 p.m.