Triple

T3605785
Position Surface form Disambiguated ID Type / Status
Subject Columbia River Treaty E76366 entity
Predicate instanceOf P0 FINISHED
Object hydropower coordination treaty C8918 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydropower coordination treaty
Context triple: [Columbia River Treaty, instanceOf, hydropower coordination treaty]
  • A. water resources management agreement chosen
    A water resources management agreement is a formal arrangement between parties that defines rights, responsibilities, and coordinated actions for the sustainable allocation, use, protection, and monitoring of shared water resources.
  • B. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • C. river basin organization
    A river basin organization is an institutional body responsible for coordinating the management, development, and protection of water and related resources within a defined river basin across sectors and jurisdictions.
  • D. multipurpose dam
    A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
  • E. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d93dcc819094fba90cf70f4996 completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:22 p.m.