Triple
T3602158
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Directorate for Mission Services |
E76280
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | support component |
C3976
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: support component Context triple: [Directorate for Mission Services, instanceOf, support component]
-
A.
component accord
A component accord is a cohesive set of interrelated parts or modules that function together under shared rules or standards to achieve a unified purpose within a larger system.
-
B.
reserve component
A reserve component is a supplementary part of a system or organization that remains available for use when primary resources are insufficient, unavailable, or require reinforcement.
-
C.
component of structure
chosen
A component of structure is an individual part or element that, when combined with other components, forms a larger, organized whole within a system or construction.
-
D.
research support community
A research support community is a collaborative network of individuals and resources that provides guidance, feedback, tools, and encouragement to help researchers conduct, improve, and share their work.
-
E.
integration component
An integration component is a modular software element that connects and coordinates interactions between disparate systems, services, or applications to enable seamless data and process flow.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85d93dcc819094fba90cf70f4996 |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:22 p.m.