Triple
T35974485
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Inner Forth Landscape Initiative |
E1040374
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | landscape partnership project |
C14947
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: landscape partnership project Context triple: [Inner Forth Landscape Initiative, instanceOf, landscape partnership project]
-
A.
landscape management partnership
chosen
A landscape management partnership is a collaborative arrangement among diverse stakeholders—such as landowners, communities, governments, and NGOs—to plan, coordinate, and implement sustainable practices across a shared landscape for ecological, economic, and social benefits.
-
B.
landscape infrastructure
Landscape infrastructure is the integrated system of natural and designed land-based elements—such as greenways, parks, water systems, and ecological corridors—that together provide environmental, social, and economic services for a region.
-
C.
landscape architecture plan
A landscape architecture plan is a detailed, scaled drawing that illustrates the design, layout, and intended use of outdoor spaces, including plantings, hardscapes, circulation, and site features.
-
D.
landscape garden
A landscape garden is a designed outdoor space that artfully arranges landforms, plants, water, and built features to create a harmonious, scenic, and often naturalistic environment for aesthetic enjoyment and recreation.
-
E.
landscape architecture office
A landscape architecture office is a professional practice that plans, designs, and manages outdoor spaces—such as parks, gardens, campuses, and urban environments—by integrating aesthetics, ecology, and functionality.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e27758c81909b711cf38a130aaf |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:07 p.m.