Triple

T35969613
Position Surface form Disambiguated ID Type / Status
Subject AMD Instinct MI300 series E1040243 entity
Predicate instanceOf P0 FINISHED
Object data center accelerator series C36935 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: data center accelerator series
Context triple: [AMD Instinct MI300 series, instanceOf, data center accelerator series]
  • A. accelerator infrastructure
    Accelerator infrastructure encompasses the physical facilities, technical systems, and support services required to design, build, operate, and maintain particle accelerators and their associated experimental environments.
  • B. data center network
    A data center network is a specialized, high-performance communication infrastructure that interconnects servers, storage systems, and networking devices within and between data centers to enable efficient, reliable data exchange and application delivery.
  • C. data center
    A data center is a specialized facility that houses networked computer systems, storage, and infrastructure to process, manage, and store large volumes of digital data.
  • D. data center GPU chosen
    A data center GPU is a high-performance graphics processing unit designed for server environments to accelerate large-scale parallel workloads such as AI, HPC, and data analytics with optimized power, cooling, and reliability features.
  • E. data center platform
    A data center platform is an integrated environment of hardware, software, and management tools that provides scalable, secure, and reliable infrastructure for hosting, processing, and managing data and applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e27758c81909b711cf38a130aaf completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:07 p.m.