Triple

T3593515
Position Surface form Disambiguated ID Type / Status
Subject CTA Green Line E76081 entity
Predicate servesStation P839 FINISHED
Object Adams/Wabash station E94452 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Adams/Wabash station | Statement: [CTA Green Line, servesStation, Adams/Wabash station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Adams/Wabash station
Context triple: [CTA Green Line, servesStation, Adams/Wabash station]
  • A. Adams/Wabash station chosen
    Adams/Wabash station is an elevated Chicago "L" train stop in the Loop, serving multiple lines in the heart of downtown Chicago.
  • B. Washington/Wabash station
    Washington/Wabash station is a Chicago 'L' rapid transit station in the Loop that serves multiple elevated lines and replaced the former Randolph/Wabash and Madison/Wabash stations.
  • C. Lincoln station
    Lincoln station is a commuter rail stop in Lincoln, Massachusetts, serving passengers on the MBTA's Fitchburg Line.
  • D. South Bend Airport station
    South Bend Airport station is a passenger rail station in South Bend, Indiana that serves as the eastern terminus of the South Shore Line commuter rail connecting to Chicago.
  • E. Elburn station
    Elburn station is a commuter rail station in Elburn, Illinois, serving as the western endpoint of Metra’s Union Pacific West Line to Chicago.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d8042081908af94a04c410dec0 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc15bbbcc81908d6cf95f8e70c6ca completed March 8, 2026, 6:35 p.m.
NED1 Entity disambiguation (via context triple) batch_69b43307cb548190824bb6704e339bff completed March 13, 2026, 3:53 p.m.
Created at: March 8, 2026, 3:22 p.m.