Triple
T35878286
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hua Lamphong MRT station |
E1037433
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | MRT Blue Line station |
C18274
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: MRT Blue Line station Context triple: [Hua Lamphong MRT station, instanceOf, MRT Blue Line station]
-
A.
Pink Line station
A Pink Line station is a designated stop or terminal along a transit system’s Pink Line where passengers can board, alight, and transfer between services.
-
B.
MRT station
An MRT station is a designated public transit facility where passengers access, board, and alight mass rapid transit trains, typically featuring platforms, ticketing systems, and connections to surrounding urban infrastructure.
-
C.
BTS Skytrain station
A BTS Skytrain station is an elevated or at-grade rail stop on Bangkok’s rapid transit system where passengers board, alight, and transfer between Skytrain lines and other transport modes.
-
D.
Kelana Jaya Line station
A Kelana Jaya Line station is a rapid transit stop along Kuala Lumpur’s Kelana Jaya LRT line that provides passenger access, boarding, and interchange facilities within the city’s rail network.
-
E.
Blue Line station
chosen
A Blue Line station is a designated stop or terminal along a transit system’s Blue Line where passengers can board, alight, and transfer between vehicles or services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e1e701c8190a4990d4978ce4fe6 |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:06 p.m.