Triple

T3584218
Position Surface form Disambiguated ID Type / Status
Subject Washington Square Park E75871 entity
Predicate constructionOfArchCompleted P49887 FINISHED
Object 1892 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1892 | Statement: [Washington Square Park, constructionOfArchCompleted, 1892]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionOfArchCompleted
Context triple: [Washington Square Park, constructionOfArchCompleted, 1892]
  • A. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • B. churchConstructionCompleted
    Indicates that the process of building or constructing a church has been finished.
  • C. constructionCompletedUnder
    Indicates that the completion of a construction project occurred under the responsibility, authority, or supervision of a specified agent, organization, or governing body.
  • D. towerCompleted
    Indicates that the construction of a tower has been fully finished and reached its intended completed state.
  • E. hasConstruction
    Indicates that one entity possesses, contains, or is characterized by a particular construction, structure, or built form associated with it.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d6dc3c8190b491b79b83e25461 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc10f9b508190bde4a4e4711dd452 completed March 8, 2026, 6:33 p.m.
PD Predicate disambiguation batch_69adb83810c481909c645c08b978edc1 completed March 8, 2026, 5:56 p.m.
PDg Predicate description generation batch_69adb8e4ba948190a9b777cf7f788b96 completed March 8, 2026, 5:59 p.m.
Created at: March 8, 2026, 3:21 p.m.