Triple

T3577940
Position Surface form Disambiguated ID Type / Status
Subject ECHELON E75731 entity
Predicate publicStatus P127 FINISHED
Object never officially acknowledged in detail LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: never officially acknowledged in detail | Statement: [ECHELON, publicStatus, never officially acknowledged in detail]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: publicStatus
Context triple: [ECHELON, publicStatus, never officially acknowledged in detail]
  • A. exportStatus
    Indicates the current state or outcome of an entity’s export process (e.g., pending, in progress, completed, or failed).
  • B. status chosen
    Indicates the current condition, state, or standing of an entity within a given context.
  • C. modernStatus
    Indicates the current or contemporary condition, classification, or standing of an entity in the present time.
  • D. programStatus
    Indicates the current state or condition of a program within its lifecycle (e.g., planned, active, paused, completed, or terminated).
  • E. worksStatus
    Indicates the current state or condition of an entity’s work or project, such as whether it is planned, in progress, completed, or otherwise categorized.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d5e3008190bdfe0bacdd1f5a1b completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc0dd3e048190a0c6666e13ead9cd completed March 8, 2026, 6:33 p.m.
PD Predicate disambiguation batch_69adb83810c481909c645c08b978edc1 completed March 8, 2026, 5:56 p.m.
Created at: March 8, 2026, 3:21 p.m.