Triple

T35730977
Position Surface form Disambiguated ID Type / Status
Subject Sabine-Neches Waterway E1032750 entity
Predicate instanceOf P0 FINISHED
Object deep-draft navigation channel C3393 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: deep-draft navigation channel
Context triple: [Sabine-Neches Waterway, instanceOf, deep-draft navigation channel]
  • A. submarine channel
    A submarine channel is an underwater valley-like feature on the seafloor formed by sediment-laden currents that transport and deposit sediments across continental margins and deep ocean basins.
  • B. navigable waterway chosen
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • C. navigation dam
    A navigation dam is a river structure designed to control water levels and flow to maintain a stable, navigable channel for boats and ships.
  • D. waterway navigation system
    A waterway navigation system is an integrated set of tools, sensors, and software that provides real-time guidance, routing, and safety information for vessels traveling on rivers, canals, and other inland or coastal waterways.
  • E. waterway section
    A waterway section is a defined segment of a natural or artificial watercourse, such as a river, canal, or channel, characterized by specific geographic, hydraulic, or administrative properties.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e10e59081908d81ad9ce22f40b6 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:05 p.m.