Triple

T35676439
Position Surface form Disambiguated ID Type / Status
Subject HP E1030872 entity
Predicate operatorUltimateSuccessor P5677 FINISHED
Object American Airlines NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: American Airlines | Statement: [HP, operatorUltimateSuccessor, American Airlines]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatorUltimateSuccessor
Context triple: [HP, operatorUltimateSuccessor, American Airlines]
  • A. successorOperator chosen
    Indicates that one operator directly follows another in a defined sequence or ordering.
  • B. eventualSuccessor
    Indicates that one entity will become the successor of another at some later point in time, rather than immediately.
  • C. successorAct
    Indicates that one action or event directly follows and replaces another in a sequence or process.
  • D. successorInCommand
    Indicates that one entity is designated to assume command authority immediately after another entity, typically when the latter is unavailable or their term ends.
  • E. successorUse
    Indicates that one entity is used or applied as the subsequent or follow-up use of another entity in a sequence or lifecycle.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0acfc0819082c8495c2210ce73 completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_6a016ebba0448190b5319243e1b2feca completed May 11, 2026, 5:52 a.m.
PD Predicate disambiguation batch_6a016d2486b4819085efe197ee21b707 completed May 11, 2026, 5:46 a.m.
Created at: May 3, 2026, 4:05 p.m.