Triple
T3561095
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Orangery at Peterhof |
E75339
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | garden pavilion |
C5508
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: garden pavilion Context triple: [Orangery at Peterhof, instanceOf, garden pavilion]
-
A.
garden feature
A garden feature is a designed element within an outdoor space—such as a pond, statue, path, or seating area—intended to enhance its visual appeal, structure, or functionality.
-
B.
public garden feature
A public garden feature is a designed element within a shared outdoor space—such as fountains, sculptures, pathways, or plant displays—intended to enhance aesthetic appeal, usability, and community enjoyment.
-
C.
botanical garden building
A botanical garden building is a specialized structure designed to cultivate, display, and study diverse plant collections in controlled environments for education, conservation, and public enjoyment.
-
D.
rooftop garden
A rooftop garden is a cultivated green space installed on the roof of a building, typically used for growing plants, improving insulation, and enhancing urban environmental quality.
-
E.
exhibition pavilion
chosen
An exhibition pavilion is a temporary or permanent standalone structure designed to showcase artworks, products, ideas, or cultural content within exhibitions, fairs, or public events.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85d45090819086f34fb85d850a1e |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:21 p.m.