Triple

T35600290
Position Surface form Disambiguated ID Type / Status
Subject NJPW Strong E1028746 entity
Predicate instanceOf P0 FINISHED
Object wrestling show C62464 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: wrestling show
Context triple: [NJPW Strong, instanceOf, wrestling show]
  • A. World Championship Wrestling show
    A World Championship Wrestling show is a televised or live event produced by the WCW promotion featuring professional wrestling matches, storylines, and entertainment segments for audiences.
  • B. WWE premium live event
    A WWE premium live event is a major, regularly scheduled professional wrestling show produced by World Wrestling Entertainment, featuring high-profile matches, championship bouts, and storyline culminations broadcast via streaming and pay-per-view platforms.
  • C. professional wrestling segment
    A professional wrestling segment is a scripted, non-wrestling portion of a wrestling show—such as interviews, promos, skits, or in-ring confrontations—designed to advance storylines, develop characters, and engage the audience.
  • D. WWE Network event
    A WWE Network event is a live or pre-recorded professional wrestling show or special produced by WWE and distributed exclusively through its WWE Network streaming service.
  • E. Impact Wrestling event
    An Impact Wrestling event is a live or televised professional wrestling show produced by Impact Wrestling, featuring scripted matches, storylines, and entertainment segments for an audience.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0598dc8190a6a093e904b9aa70 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:05 p.m.