Triple

T35540336
Position Surface form Disambiguated ID Type / Status
Subject PR-15 Ragun E1027041 entity
Predicate instanceOf P0 FINISHED
Object Code-designated project C23943 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Code-designated project
Context triple: [PR-15 Ragun, instanceOf, Code-designated project]
  • A. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • B. studio project
    A studio project is a creative, often collaborative, hands-on assignment in a studio-based course where students design, develop, and present work that applies theoretical concepts to practical, real-world or experimental problems.
  • C. codification project
    A codification project is a structured initiative to systematically collect, organize, and formalize dispersed knowledge, rules, or practices into a coherent, accessible, and standardized body of documentation.
  • D. project-based mechanism
    A project-based mechanism is a structured approach or system in which resources, incentives, and decision-making processes are organized around discrete projects to achieve specific goals or outcomes.
  • E. software project codename chosen
    A software project codename is a temporary, often memorable or symbolic name used to identify a software initiative before its official product name is finalized or revealed.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e008ba08190927acd8e5e0344c8 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.