Triple
T35538548
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cotos railway station |
E1026998
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mountain railway stop |
C14880
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mountain railway stop Context triple: [Cotos railway station, instanceOf, mountain railway stop]
-
A.
mountain railway terminus
A mountain railway terminus is the end station of a rail line located in a mountainous area, where trains arrive, reverse, or terminate their journeys and passengers transfer to other transport or facilities.
-
B.
cable car station
A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
-
C.
mountain tramway
A mountain tramway is an aerial or cable-driven transportation system that carries passengers or goods up and down steep mountainous terrain using suspended or rail-guided cars.
-
D.
narrow-gauge railway terminus
A narrow-gauge railway terminus is the end station or final stopping point on a railway line that uses tracks of narrower width than the standard gauge, where trains begin or conclude their journeys and related operations are managed.
-
E.
mountain rack railway
chosen
A mountain rack railway is a steep-gradient railway system that uses a toothed rack rail engaged by a cogwheel on the train to provide additional traction and braking on mountainous terrain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dff7e508190b28ceeee770dce23 |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:04 p.m.