Triple

T35537655
Position Surface form Disambiguated ID Type / Status
Subject Great Britain electricity distribution system E1026973 entity
Predicate instanceOf P0 FINISHED
Object electricity distribution system C7916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electricity distribution system
Context triple: [Great Britain electricity distribution system, instanceOf, electricity distribution system]
  • A. power system chosen
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • B. national grid system
    A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
  • C. electrical substation
    An electrical substation is a facility in the power system where voltage levels are transformed, controlled, and distributed using equipment such as transformers, switchgear, and protection devices.
  • D. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • E. electricity supply industry
    The electricity supply industry encompasses the generation, transmission, distribution, and retail of electrical power from producers to end users, ensuring reliable and efficient energy delivery.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dff7e508190b28ceeee770dce23 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.