Triple

T35537626
Position Surface form Disambiguated ID Type / Status
Subject Sierra Pacific Resources E1026972 entity
Predicate instanceOf P0 FINISHED
Object energy holding company C62459 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: energy holding company
Context triple: [Sierra Pacific Resources, instanceOf, energy holding company]
  • A. energy storage company
    An energy storage company designs, develops, and operates systems and technologies that capture, store, and release energy to improve grid reliability, integrate renewables, and optimize energy use.
  • B. energy supplier
    An energy supplier is an entity that procures, manages, and delivers electricity and/or gas to consumers, handling contracts, billing, and customer service while interfacing with energy producers and grid operators.
  • C. energy infrastructure company
    An energy infrastructure company develops, owns, and operates the physical assets and networks that produce, transport, store, and deliver energy resources and power to end users.
  • D. utilities company
    A utilities company is an organization that provides essential public services such as electricity, gas, water, or telecommunications to residential, commercial, and industrial customers, typically under government regulation.
  • E. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dff7e508190b28ceeee770dce23 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.