Triple
T3552779
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | G Pier |
E75147
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | passenger boarding pier |
C5954
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: passenger boarding pier Context triple: [G Pier, instanceOf, passenger boarding pier]
-
A.
ferry terminal
A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
-
B.
waterfront pier complex
chosen
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
C.
port authority
A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
-
D.
passenger railway platform
A passenger railway platform is a designated area alongside railway tracks where passengers safely board and alight from trains.
-
E.
passenger terminal concourse
A passenger terminal concourse is a large, central circulation space within a transport terminal where travelers move between entrances, ticketing, security, and boarding areas, often containing seating, retail, and information services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85d33c6c819081d5ac1df13b5680 |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:20 p.m.