Triple

T35482941
Position Surface form Disambiguated ID Type / Status
Subject 復興橋 E1025515 entity
Predicate instanceOf P0 FINISHED
Object 橋梁 C43293 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 橋梁
Context triple: [復興橋, instanceOf, 橋梁]
  • A. bridge structure chosen
    A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
  • B. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • C. 교량
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • D. beam bridge
    A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
  • E. railway bridge
    A railway bridge is a structure built to carry train tracks over obstacles such as roads, rivers, valleys, or other railways, ensuring safe and continuous rail transport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dfbcdd881908c7b0b6bc502252b completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.