Triple

T354827
Position Surface form Disambiguated ID Type / Status
Subject Cape Cod Canal Railroad Bridge E7520 entity
Predicate instanceOf P0 FINISHED
Object railway bridge C4025 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway bridge
Context triple: [Cape Cod Canal Railroad Bridge, instanceOf, railway bridge]
  • A. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • B. highway bridge
    A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
  • C. steel arch bridge
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • D. ceremonial bridge
    A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
  • E. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7e696948190bebc966535995e45 completed Feb. 28, 2026, 1:04 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.