Triple

T35480757
Position Surface form Disambiguated ID Type / Status
Subject Jageshwar group of temples (restorations and additions) E1025463 entity
Predicate instanceOf P0 FINISHED
Object architectural modification phase C39075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: architectural modification phase
Context triple: [Jageshwar group of temples (restorations and additions), instanceOf, architectural modification phase]
  • A. building alteration phase chosen
    The building alteration phase is the period in a building’s lifecycle during which modifications, renovations, or upgrades are planned and executed to change its structure, systems, or use without fully demolishing it.
  • B. architectural remodeling project
    An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
  • C. architectural renovation project
    An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
  • D. architectural development
    Architectural development is the iterative process of designing, refining, and evolving a system’s structure to meet functional, technical, and stakeholder requirements over time.
  • E. building alteration
    A building alteration is a modification or change to an existing structure’s design, layout, or components that does not constitute complete demolition or new construction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dfadba0819083456aadcd6864ea completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.