Triple

T35446172
Position Surface form Disambiguated ID Type / Status
Subject Do 335 A-0 E1024491 entity
Predicate instanceOf P0 FINISHED
Object pre-production aircraft variant C6075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pre-production aircraft variant
Context triple: [Do 335 A-0, instanceOf, pre-production aircraft variant]
  • A. military trainer aircraft variant
    A military trainer aircraft variant is a modified version of a standard military aircraft specifically adapted with dual controls, simplified systems, or performance changes to safely train pilots and aircrew in operational flying skills.
  • B. unbuilt aircraft project
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • C. prototype bomber aircraft
    A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
  • D. experimental aircraft chosen
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • E. prototype tank
    A prototype tank is an experimental armored combat vehicle built to test and refine new technologies, designs, and capabilities before mass production and frontline deployment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76df8089481909f0018266ee881b7 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.