Triple
T35418769
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North Bay Trail |
E1023721
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban shared-use path |
C58011
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban shared-use path Context triple: [North Bay Trail, instanceOf, urban shared-use path]
-
A.
paved multi-use path
chosen
A paved multi-use path is a smooth, hard-surfaced corridor designed to safely accommodate a variety of non-motorized users such as pedestrians, cyclists, and skaters.
-
B.
urban promenade
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
-
C.
bicycle and pedestrian network
A bicycle and pedestrian network is an interconnected system of paths, lanes, sidewalks, and crossings designed to safely and efficiently accommodate non-motorized travel for cyclists and walkers.
-
D.
urban public space
An urban public space is a publicly accessible area within a city—such as streets, parks, plazas, and squares—designed or used for social interaction, movement, recreation, and civic life.
-
E.
urban junction
An urban junction is a point where multiple city streets or transportation routes intersect, facilitating the flow and regulation of vehicular, pedestrian, and sometimes transit traffic within an urban network.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76df6704081909900c60be10d5849 |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:03 p.m.