Triple

T3536371
Position Surface form Disambiguated ID Type / Status
Subject Lego E74782 entity
Predicate instanceOf P0 FINISHED
Object construction toy line C11077 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction toy line
Context triple: [Lego, instanceOf, construction toy line]
  • A. interlocking block chosen
    An interlocking block is a modular construction unit designed with complementary shapes or connectors that allow it to securely join with adjacent blocks without the need for additional fasteners or adhesives.
  • B. amusement ride manufacturer
    An amusement ride manufacturer is a company or entity that designs, engineers, constructs, and often installs mechanical attractions such as roller coasters, carousels, and other rides for amusement parks and entertainment venues.
  • C. automobile factory
    An automobile factory is a large-scale industrial facility where raw materials and components are systematically assembled, tested, and finished into complete motor vehicles using coordinated machinery, labor, and production processes.
  • D. invention kit
    An invention kit is a collection of modular components, tools, and instructions designed to help users creatively design, build, and prototype their own functional devices or systems.
  • E. programmable robotics kit line
    A programmable robotics kit line is a series of modular, code-controlled robot sets that let users design, build, and program customizable robotic creations for education, experimentation, and play.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d1a3948190931fd1ea1f49717b completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:20 p.m.