Triple

T3530074
Position Surface form Disambiguated ID Type / Status
Subject Shimsha E74636 entity
Predicate hasHydroelectricProject P15311 FINISHED
Object Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
E364416 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shimsha Hydroelectric Project | Statement: [Shimsha, hasHydroelectricProject, Shimsha Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Shimsha Hydroelectric Project
Context triple: [Shimsha, hasHydroelectricProject, Shimsha Hydroelectric Project]
  • A. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • B. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • C. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • D. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • E. Lower Subansiri Hydroelectric Project
    The Lower Subansiri Hydroelectric Project is a major run-of-the-river dam and power station under construction on the Subansiri River in India, intended to generate significant hydroelectric power for the northeastern region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Shimsha Hydroelectric Project
Triple: [Shimsha, hasHydroelectricProject, Shimsha Hydroelectric Project]
Generated description
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Shimsha Hydroelectric Project
Target entity description: Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • A. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • B. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • C. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • D. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • E. Lower Subansiri Hydroelectric Project
    The Lower Subansiri Hydroelectric Project is a major run-of-the-river dam and power station under construction on the Subansiri River in India, intended to generate significant hydroelectric power for the northeastern region.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d1a3948190931fd1ea1f49717b completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adbc9764a881908aa8d25dc9adf59e completed March 8, 2026, 6:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69b37e97536881908d5ed3dfe602c9e0 completed March 13, 2026, 3:03 a.m.
NEDg Description generation batch_69b37f232b8881908f7b4df89399d1d8 completed March 13, 2026, 3:06 a.m.
NED2 Entity disambiguation (via description) batch_69b37f8fea9481909eb82a06e6c71e98 completed March 13, 2026, 3:08 a.m.
Created at: March 8, 2026, 3:19 p.m.