Triple

T35299545
Position Surface form Disambiguated ID Type / Status
Subject Block D (Bletchley Park) E1019466 entity
Predicate replacedWorkPreviouslyDoneIn P196103 FINISHED
Object wooden huts at Bletchley Park LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: wooden huts at Bletchley Park | Statement: [Block D (Bletchley Park), replacedWorkPreviouslyDoneIn, wooden huts at Bletchley Park]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: replacedWorkPreviouslyDoneIn
Context triple: [Block D (Bletchley Park), replacedWorkPreviouslyDoneIn, wooden huts at Bletchley Park]
  • A. replacedInSomeWorkflowsBy
    Indicates that in certain workflows or processes, one entity is substituted or superseded by another.
  • B. replacedDuring
    Indicates that one entity took the place of another entity during a specified time period or interval.
  • C. materialWorked
    Indicates that an agent performs work or processing on a specified material.
  • D. previousWorkAfterHiatusOf
    Indicates that one work directly follows and resumes activity after a hiatus or break from a previous work.
  • E. repairsCompleted
    Indicates that a previously initiated repair action or process has been fully carried out and successfully finished.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76de7eedc8190a3bdc64ebbc05b42 completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69fe066d62b48190867df334039be786 completed May 8, 2026, 3:51 p.m.
PD Predicate disambiguation batch_69fe03afde3c8190a5b9b0778d19eb1a completed May 8, 2026, 3:39 p.m.
PDg Predicate description generation batch_69fe066b623c819085205fbea901e3cf completed May 8, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:03 p.m.