Triple

T3522442
Position Surface form Disambiguated ID Type / Status
Subject National Plan of Integrated Airport Systems E74454 entity
Predicate instanceOf P0 FINISHED
Object aviation infrastructure plan C13955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aviation infrastructure plan
Context triple: [National Plan of Integrated Airport Systems, instanceOf, aviation infrastructure plan]
  • A. aviation safety audit program
    An aviation safety audit program is a systematic, structured process for evaluating and verifying an aviation organization’s compliance with safety regulations, standards, and best practices to identify risks and drive continuous safety improvement.
  • B. airport system
    An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
  • C. airspace governance framework
    An airspace governance framework is a structured set of policies, regulations, and institutional arrangements that define how airspace is allocated, managed, monitored, and enforced to ensure safe, efficient, and equitable use by all airspace users.
  • D. business aviation airport
    A business aviation airport is a specialized airfield designed primarily to serve private, corporate, and charter aircraft with tailored facilities and services for non-scheduled, business-focused air travel.
  • E. business aviation airport
    A business aviation airport is a specialized airfield designed primarily to serve private, corporate, and charter aircraft with tailored facilities and services for business travelers.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d0c5488190a3d8e02ebd01a1aa completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:19 p.m.