Triple

T3521030
Position Surface form Disambiguated ID Type / Status
Subject Merchandise Mart E74421 entity
Predicate instanceOf P0 FINISHED
Object design center C13947 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: design center
Context triple: [Merchandise Mart, instanceOf, design center]
  • A. design bureau
    A design bureau is an organization or department that specializes in planning, developing, and refining product, graphic, or architectural designs, often providing creative and technical solutions for clients or internal projects.
  • B. design practice
    Design practice is the systematic, iterative application of design methods, tools, and principles to solve problems, create meaningful experiences, and refine solutions in real-world contexts.
  • C. design team
    A design team is a collaborative group of professionals who combine diverse creative, technical, and strategic skills to research, conceptualize, and produce user-centered design solutions.
  • D. chief designer
    The chief designer is the lead creative authority responsible for defining and overseeing the overall design vision, strategy, and quality across a product, project, or organization.
  • E. architectural design tool
    An architectural design tool is a software application that enables architects and designers to create, visualize, analyze, and document building concepts and structures digitally.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d0c5488190a3d8e02ebd01a1aa completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:19 p.m.