Triple

T351942
Position Surface form Disambiguated ID Type / Status
Subject Operation Sea Lion E7461 entity
Predicate plannedStartDate P288 FINISHED
Object 1940-09-15 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1940-09-15 | Statement: [Operation Sea Lion, plannedStartDate, 1940-09-15]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedStartDate
Context triple: [Operation Sea Lion, plannedStartDate, 1940-09-15]
  • A. datePlanned
    Indicates that a specific date has been scheduled or intended for a particular event, action, or relationship to occur.
  • B. startDate chosen
    Indicates the point in time when an event, state, or relationship begins.
  • C. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • D. proposalDate
    Indicates the date on which a proposal is formally made or submitted from one entity to another.
  • E. firstPlanStartYear
    Indicates the calendar year in which an entity’s initial plan or planning period begins.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7e696948190bebc966535995e45 completed Feb. 28, 2026, 1:04 p.m.
NER Named-entity recognition batch_69a2eb7f1be88190964ddcbb6a05f021 completed Feb. 28, 2026, 1:19 p.m.
PD Predicate disambiguation batch_69a2e9571bd88190b6fcb16f21604720 completed Feb. 28, 2026, 1:10 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.