Triple

T3508501
Position Surface form Disambiguated ID Type / Status
Subject Red River (Vietnam) E74138 entity
Predicate hasStructure P35 FINISHED
Object Thang Long Bridge E208762 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Thang Long Bridge | Statement: [Red River (Vietnam), hasStructure, Thang Long Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Thang Long Bridge
Context triple: [Red River (Vietnam), hasStructure, Thang Long Bridge]
  • A. Can Tho Bridge
    Can Tho Bridge is a major cable-stayed bridge in southern Vietnam that spans the Hau River, significantly improving transportation links in the Mekong Delta region.
  • B. Vĩnh Tuy Bridge chosen
    Vĩnh Tuy Bridge is a major road bridge spanning the Red River in Hanoi, Vietnam, helping connect central urban districts and ease traffic congestion.
  • C. Thu Thiem Bridge
    Thu Thiem Bridge is a major road bridge in Ho Chi Minh City, Vietnam, connecting the city center with the Thu Thiem urban area in District 2.
  • D. Thuan Phuoc Bridge
    Thuan Phuoc Bridge is a large modern suspension bridge in Da Nang, Vietnam, known for spanning the Han River near its mouth and serving as a prominent city landmark.
  • E. Saigon Bridge
    Saigon Bridge is a major road bridge in Ho Chi Minh City, Vietnam, serving as a key transportation link across the Saigon River and an important part of the city’s infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85ce7a9c81909ddc5cf0cb67a6e3 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adbc0cc394819087a9b598023f4f93 completed March 8, 2026, 6:12 p.m.
NED1 Entity disambiguation (via context triple) batch_69b3bb7d6ab881909bf4c895646af259 completed March 13, 2026, 7:23 a.m.
Created at: March 8, 2026, 3:18 p.m.