Triple
T3504694
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Paducah Wall to Wall Murals |
E74047
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public art project |
C3518
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public art project Context triple: [Paducah Wall to Wall Murals, instanceOf, public art project]
-
A.
public art program
A public art program is an organized initiative, typically led by a government or institution, that commissions, funds, and manages artworks in public spaces to enhance community identity, cultural expression, and shared environments.
-
B.
public art space
A public art space is a shared, accessible environment—physical or virtual—where artworks are displayed or performed for community engagement, cultural expression, and public interaction.
-
C.
public art trail
chosen
A public art trail is a curated, often walkable route through outdoor spaces that connects multiple artworks or installations, encouraging community engagement with art in everyday environments.
-
D.
art studio
An art studio is a dedicated space equipped with tools, materials, and appropriate lighting where artists create, experiment with, and refine their artwork.
-
E.
work of art
A work of art is a deliberately created object, performance, or experience intended to express ideas or emotions and to be perceived and interpreted aesthetically.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85ce7a9c81909ddc5cf0cb67a6e3 |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:18 p.m.