Triple

T35045101
Position Surface form Disambiguated ID Type / Status
Subject Albanian road network E1011174 entity
Predicate hasMajorRoute P385 FINISHED
Object A3 motorway (Albania)
The A3 motorway in Albania is a key high-speed highway that connects the capital Tirana with the southeastern city of Elbasan, improving regional mobility and linking central Albania with neighboring countries.
E2128344 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A3 motorway (Albania) | Statement: [Albanian road network, hasMajorRoute, A3 motorway (Albania)]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A3 motorway (Albania)
Triple: [Albanian road network, hasMajorRoute, A3 motorway (Albania)]
Generated description
The A3 motorway in Albania is a key high-speed highway that connects the capital Tirana with the southeastern city of Elbasan, improving regional mobility and linking central Albania with neighboring countries.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dcfdda48190b1ebae5da8b54f12 completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69f78595d1508190b1d10f586af7cd82 completed May 3, 2026, 5:27 p.m.
NED1 Entity disambiguation (via context triple) batch_6a37d93fb450819094781ba06f7e1bb3 completed June 21, 2026, 12:29 p.m.
NEDg Description generation batch_6a37dd7aa0e88190a1b163608970b643 completed June 21, 2026, 12:47 p.m.
NED2 Entity disambiguation (via description) batch_6a37de263a988190bc9f98df87175e41 completed June 21, 2026, 12:50 p.m.
Created at: May 3, 2026, 4:01 p.m.