Triple

T35023116
Position Surface form Disambiguated ID Type / Status
Subject Earth–Moon Lagrange region E1010249 entity
Predicate instanceOf P0 FINISHED
Object Lagrange point system C10640 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Lagrange point system
Context triple: [Earth–Moon Lagrange region, instanceOf, Lagrange point system]
  • A. gravitational equilibrium point chosen
    A gravitational equilibrium point is a location in space where the gravitational forces and orbital motion of a small object balance so that it can remain in a stable or semi-stable position relative to larger bodies.
  • B. planet–satellite system
    A planet–satellite system is a gravitationally bound pair (or set) of celestial bodies consisting of a primary planet and one or more natural satellites that orbit it, interacting dynamically over time.
  • C. celestial mechanics concept
    A celestial mechanics concept is an abstract idea or principle that describes and predicts the motions, interactions, and gravitational behaviors of astronomical bodies in space.
  • D. orbital resonance
    Orbital resonance is a gravitational phenomenon in which two orbiting bodies exert regular, periodic influences on each other because their orbital periods are in a simple integer ratio, often stabilizing or destabilizing their orbits.
  • E. orbit
    An orbit is the curved path that an object follows around a point or another object in space due to gravitational or other central forces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dccf0108190af43b465d3750196 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:01 p.m.