Triple

T349882
Position Surface form Disambiguated ID Type / Status
Subject Glasgow E7418 entity
Predicate locatedOnRiver P165 FINISHED
Object River Clyde E17484 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Clyde | Statement: [Glasgow, locatedOnRiver, River Clyde]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: River Clyde
Context triple: [Glasgow, locatedOnRiver, River Clyde]
  • A. River Clyde chosen
    The River Clyde is a major Scottish river historically renowned for flowing through Glasgow and serving as a key center of shipbuilding and industry.
  • B. River Tay
    The River Tay is the longest river in Scotland, renowned for its salmon fishing and its broad, powerful flow through the Scottish Highlands and Lowlands before reaching the North Sea.
  • C. River Mersey
    The River Mersey is a major river in North West England that flows through cities including Manchester and Liverpool before emptying into the Irish Sea.
  • D. River Tweed
    River Tweed is a major river in the Scottish Borders and northern England, famed for its salmon fishing and as the namesake of tweed fabric.
  • E. River Trent
    The River Trent is one of the principal rivers in the Midlands of England, flowing through cities such as Stoke-on-Trent and Nottingham before joining the Humber Estuary.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7e696948190bebc966535995e45 completed Feb. 28, 2026, 1:04 p.m.
NER Named-entity recognition batch_69a2eb1f028c819098fa6480b4ca5cf0 completed Feb. 28, 2026, 1:18 p.m.
NED1 Entity disambiguation (via context triple) batch_69a457fa35988190851216c84ad63232 completed March 1, 2026, 3:15 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.