Triple
T34986573
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grand River system |
E1008964
|
entity |
| Predicate | hasHydroelectricFacility |
P15311
|
FINISHED |
| Object |
Robert S. Kerr Dam
Robert S. Kerr Dam is a hydroelectric and navigation dam on the Arkansas River in Oklahoma, forming Robert S. Kerr Reservoir and contributing to regional power generation and flood control.
|
E2288510
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Robert S. Kerr Dam | Statement: [Grand River system, hasHydroelectricFacility, Robert S. Kerr Dam]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Robert S. Kerr Dam Triple: [Grand River system, hasHydroelectricFacility, Robert S. Kerr Dam]
Generated description
Robert S. Kerr Dam is a hydroelectric and navigation dam on the Arkansas River in Oklahoma, forming Robert S. Kerr Reservoir and contributing to regional power generation and flood control.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dc844a48190881951fffb83d17e |
completed | May 3, 2026, 3:46 p.m. |
| NER | Named-entity recognition | batch_69f7849d996481909baf92a2d8b69133 |
completed | May 3, 2026, 5:23 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a5a9721c2c48190a430af779c6bafb4 |
completed | July 17, 2026, 8:57 p.m. |
| NEDg | Description generation | batch_6a5a97d2f64481909e7c2b7cff4a1148 |
completed | July 17, 2026, 9 p.m. |
| NED2 | Entity disambiguation (via description) | batch_6a5a985930e0819099d32a215fc0dba1 |
completed | July 17, 2026, 9:02 p.m. |
Created at: May 3, 2026, 4:01 p.m.