Triple
T34968322
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brooklyn Bridge–City Hall/Chambers Street bus stops |
E1008463
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bus stop complex |
C6107
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bus stop complex Context triple: [Brooklyn Bridge–City Hall/Chambers Street bus stops, instanceOf, bus stop complex]
-
A.
bus station
chosen
A bus station is a designated facility where buses arrive, depart, and lay over, providing passengers with areas to board, alight, purchase tickets, and access related transit services.
-
B.
shuttle bus stop
A shuttle bus stop is a designated location where shuttle buses regularly pick up and drop off passengers according to a specific route or service schedule.
-
C.
bus and rail station
A bus and rail station is a transportation hub where passengers can board, disembark, and transfer between bus and train services within an integrated facility.
-
D.
trolleybus stop
A trolleybus stop is a designated roadside area where trolleybuses halt to safely pick up and drop off passengers, typically marked with signage and sometimes shelters or platforms.
-
E.
transport stop
A transport stop is a designated place where passengers can board or alight from public or shared transportation services such as buses, trams, or trains.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dc78a308190a1ac29ad4a9a4895 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.