Triple
T34956530
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Leiningen |
E1008134
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Clojure build tool |
C9685
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Clojure build tool Context triple: [Leiningen, instanceOf, Clojure build tool]
-
A.
Clojure library
A Clojure library is a reusable collection of Clojure code, functions, and namespaces packaged to provide specific functionality that can be easily integrated into Clojure applications.
-
B.
front-end build tool
A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
-
C.
software build and distribution system
chosen
A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
-
D.
collection of programming tools
A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
-
E.
build configuration language
A build configuration language is a specialized, often declarative language used to define how software should be compiled, linked, packaged, and deployed across different environments and platforms.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dc69564819099e9e78aed6ff0a6 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.