Triple

T3492856
Position Surface form Disambiguated ID Type / Status
Subject Evolved Expendable Launch Vehicle program E73777 entity
Predicate instanceOf P0 FINISHED
Object space launch vehicle development program C12851 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: space launch vehicle development program
Context triple: [Evolved Expendable Launch Vehicle program, instanceOf, space launch vehicle development program]
  • A. orbital launch vehicle
    An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
  • B. expendable launch vehicle
    An expendable launch vehicle is a rocket designed for a single use to deliver payloads such as satellites or spacecraft into space, after which its components are discarded rather than recovered or reused.
  • C. space transportation system
    A space transportation system is an integrated set of vehicles, infrastructure, and operations designed to move payloads and passengers between Earth and space or between locations in space.
  • D. human spaceflight program
    A human spaceflight program is an organized, long-term governmental or commercial initiative that designs, funds, and operates crewed missions beyond Earth’s atmosphere for exploration, research, and related objectives.
  • E. expendable launch system
    An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85cca8d4819088494e9f3340fab5 completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:18 p.m.