Triple

T34922546
Position Surface form Disambiguated ID Type / Status
Subject Will E1007185 entity
Predicate instanceOf P0 FINISHED
Object film or television production C59400 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: film or television production
Context triple: [Will, instanceOf, film or television production]
  • A. film and television production phase
    A film and television production phase is a distinct stage in the creation process—such as development, pre-production, production, post-production, or distribution—during which specific tasks and workflows are carried out to move a project from concept to final release.
  • B. screen production chosen
    Screen production is the process of planning, creating, and assembling visual content for film, television, or digital platforms, encompassing pre-production, filming, and post-production activities.
  • C. film production program
    A film production program is an organized course of study or training that teaches the creative, technical, and logistical skills needed to develop, shoot, and edit motion picture projects.
  • D. film production technology
    Film production technology encompasses the tools, equipment, and digital systems used to plan, capture, edit, and distribute motion pictures.
  • E. live-action television production
    A live-action television production is a scripted or unscripted show created by filming real actors and physical environments, then edited and assembled for broadcast or streaming distribution.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dc2b6b0819095a61debbd405269 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4 p.m.