Triple
T34920652
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Clifford Stine |
E1007125
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | special effects cinematographer |
C2484
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: special effects cinematographer Context triple: [Clifford Stine, instanceOf, special effects cinematographer]
-
A.
special effects supervisor
A special effects supervisor oversees the design, planning, and execution of practical and digital effects for film, television, or live productions to achieve the desired visual impact safely and convincingly.
-
B.
visual effects supervisor
A visual effects supervisor oversees the planning, creation, and integration of digital and practical visual effects to achieve a director’s creative vision within technical and budgetary constraints.
-
C.
visual effects producer
A visual effects producer oversees the planning, budgeting, scheduling, and coordination of all VFX work on a film, television, or media project, ensuring creative goals are met on time and within budget.
-
D.
cinematographer
chosen
A cinematographer is the visual storyteller responsible for crafting a film’s look through camera work, lighting, and shot composition in collaboration with the director.
-
E.
visual effects professional
A visual effects professional is a creative and technical specialist who designs, develops, and integrates digital imagery and effects into film, television, games, or other media to enhance or create visual storytelling elements.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dc2b6b0819095a61debbd405269 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.