Triple
T34909060
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oswaldtwistle Mills |
E1006813
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | retail outlet centre |
C1524
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: retail outlet centre Context triple: [Oswaldtwistle Mills, instanceOf, retail outlet centre]
-
A.
shopping centre
chosen
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
B.
outlet centre developer
An outlet centre developer is a company or individual that plans, finances, constructs, and manages retail complexes dedicated primarily to discounted brand and factory outlet stores.
-
C.
shopping mall
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
D.
wholesale trade center
A wholesale trade center is a large-scale commercial facility where manufacturers, distributors, and retailers conduct bulk purchasing and selling of goods, often offering a wide variety of products at discounted prices for resale.
-
E.
retail location
A retail location is a physical or virtual place where goods or services are offered for sale directly to consumers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dc1b4a081909b4c6e4d8ec0aa2d |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.