Triple

T34883290
Position Surface form Disambiguated ID Type / Status
Subject Engineering and Manufacturing Development phase E1006069 entity
Predicate exitDecision P65611 FINISHED
Object Milestone C LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Milestone C | Statement: [Engineering and Manufacturing Development phase, exitDecision, Milestone C]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: exitDecision
Context triple: [Engineering and Manufacturing Development phase, exitDecision, Milestone C]
  • A. exitTo
    Indicates that one location or entity serves as a passage or route leading directly to another location or entity.
  • B. decisionToWithdraw
    Indicates that an entity has made a choice or resolution to pull back from, discontinue, or remove involvement in something.
  • C. closureDecision
    Indicates a decision has been made to permanently or temporarily close an entity, operation, or process.
  • D. decisionType
    Indicates the specific category or nature of a decision associated with an entity or event.
  • E. decisionOutput chosen
    Indicates that a decision-making process produces or yields a particular outcome or result.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dbedb288190afe5780710847410 completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69f782f4f10081908f97f6d0d2dbeec7 completed May 3, 2026, 5:16 p.m.
PD Predicate disambiguation batch_69f780ff71cc8190a67e71076fbad81a completed May 3, 2026, 5:08 p.m.
Created at: May 3, 2026, 4 p.m.