Triple

T34857622
Position Surface form Disambiguated ID Type / Status
Subject Lenhydroproject Institute E1004769 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric power design institute C62120 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydroelectric power design institute
Context triple: [Lenhydroproject Institute, instanceOf, hydroelectric power design institute]
  • A. hydropower authority
    A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
  • B. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • C. hydropower operations division
    The hydropower operations division oversees the planning, control, and maintenance of hydroelectric facilities to ensure safe, efficient, and reliable power generation from water resources.
  • D. planned hydroelectric power station
    A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
  • E. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dba76f0819090643cba102c41ec completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4 p.m.