Triple
T34855228
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SEPTA Planning Department |
E1004710
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | division of SEPTA |
C62399
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: division of SEPTA Context triple: [SEPTA Planning Department, instanceOf, division of SEPTA]
-
A.
SEPTA capital project
A SEPTA capital project is a long-term, large-scale investment initiative undertaken by the Southeastern Pennsylvania Transportation Authority to plan, design, construct, or upgrade transit infrastructure, vehicles, and related facilities.
-
B.
SEPTA Norristown High Speed Line station
A SEPTA Norristown High Speed Line station is a passenger transit stop along the Norristown High Speed Line that provides platforms, access facilities, and services for boarding and alighting high-speed light rail vehicles.
-
C.
division of Metropolitan Transportation Authority
A division of the Metropolitan Transportation Authority is an organizational unit responsible for managing and operating a specific set of transit services, assets, or functions within the broader MTA system.
-
D.
SEPTA trolley stop
A SEPTA trolley stop is a designated location along a Southeastern Pennsylvania Transportation Authority trolley route where passengers can board and alight from streetcars, typically marked by signage, shelters, or platforms integrated into the urban streetscape.
-
E.
SEPTA trolley route
A SEPTA trolley route is a designated public transit line in the Philadelphia region where electric streetcars operate along fixed tracks and schedules to transport passengers between specific neighborhoods and destinations.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dba76f0819090643cba102c41ec |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.