Triple

T3483596
Position Surface form Disambiguated ID Type / Status
Subject Niger State E73553 entity
Predicate knownFor P22 FINISHED
Object Kainji Dam E148493 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kainji Dam | Statement: [Niger State, knownFor, Kainji Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kainji Dam
Context triple: [Niger State, knownFor, Kainji Dam]
  • A. Kainji Dam chosen
    Kainji Dam is a major hydroelectric power and irrigation dam in Nigeria, forming Lake Kainji and serving as a key source of electricity and water management in the region.
  • B. Wyangala Dam
    Wyangala Dam is a major water storage and flood mitigation reservoir in New South Wales, Australia, serving irrigation, water supply, and recreational purposes.
  • C. Sennar Dam
    Sennar Dam is a major early-20th-century irrigation and hydroelectric dam on the Blue Nile in Sudan, crucial for agricultural development in the Gezira region.
  • D. Roseires Dam
    Roseires Dam is a major hydroelectric and irrigation dam on the Blue Nile in Sudan, crucial for water storage, power generation, and flood control in the region.
  • E. Jebba Dam
    Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85b3c9b08190857cae74c7f36da9 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adbb781e9c8190810fdd814f506127 completed March 8, 2026, 6:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69b36820c90c819091b68cff7a0a2cda completed March 13, 2026, 1:28 a.m.
Created at: March 8, 2026, 3:17 p.m.