Triple
T3483596
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Niger State |
E73553
|
entity |
| Predicate | knownFor |
P22
|
FINISHED |
| Object | Kainji Dam |
E148493
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kainji Dam | Statement: [Niger State, knownFor, Kainji Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Kainji Dam Context triple: [Niger State, knownFor, Kainji Dam]
-
A.
Kainji Dam
chosen
Kainji Dam is a major hydroelectric power and irrigation dam in Nigeria, forming Lake Kainji and serving as a key source of electricity and water management in the region.
-
B.
Wyangala Dam
Wyangala Dam is a major water storage and flood mitigation reservoir in New South Wales, Australia, serving irrigation, water supply, and recreational purposes.
-
C.
Sennar Dam
Sennar Dam is a major early-20th-century irrigation and hydroelectric dam on the Blue Nile in Sudan, crucial for agricultural development in the Gezira region.
-
D.
Roseires Dam
Roseires Dam is a major hydroelectric and irrigation dam on the Blue Nile in Sudan, crucial for water storage, power generation, and flood control in the region.
-
E.
Jebba Dam
Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85b3c9b08190857cae74c7f36da9 |
completed | March 8, 2026, 2:20 p.m. |
| NER | Named-entity recognition | batch_69adbb781e9c8190810fdd814f506127 |
completed | March 8, 2026, 6:10 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b36820c90c819091b68cff7a0a2cda |
completed | March 13, 2026, 1:28 a.m. |
Created at: March 8, 2026, 3:17 p.m.